Skip to content
LMOSTLINS

AA/CAP/006Capability

Surface treatment

AA/CAP/006 · ISO 2768-F · ISO 9001 IN PROGRESS · 24 H VERIFIED QUOTE

Anodising, chemical conversion, passivation, titanium anodise, electroless nickel and vacuum bake-out through qualified treatment houses, with every finish to a named specification, masking agreed per drawing, certificates unaltered.

Materials

Alloys we source, by family

Certified stock with mill test certificates traced to heat and lot. The relative cycle-time factor drives our lead-time model; it is not a price factor.

Aluminium
ItemDensityCycle-time factorAnodising route
Aluminium 6061-T6
2.70 g/cm³×1.00MIL-A-8625
Aluminium 7075-T651
2.81 g/cm³×1.15MIL-A-8625
Aluminium 2024-T4
2.78 g/cm³×1.15MIL-A-8625
Titanium
ItemDensityCycle-time factorAnodising route
Titanium Gr5 (Ti-6Al-4V)
4.43 g/cm³×2.40AMS-2488
Corrosion-resistant steel
ItemDensityCycle-time factorAnodising route
Stainless 316L
8.00 g/cm³×1.80Not anodisable
Stainless 17-4 PH
7.80 g/cm³×2.00Not anodisable
Nickel alloy
ItemDensityCycle-time factorAnodising route
Inconel 718
8.19 g/cm³×3.00Not anodisable
Magnesium
ItemDensityCycle-time factorAnodising route
Magnesium AZ31B
1.77 g/cm³×0.90Not anodisable

Need an alloy not listed? Add it as a note on the RFQ line. It is routed for manual review with a sourcing check before we quote. We do not decline on the alloy alone.

Finishes

Every finish names its specification

A finish call-out without a specification is not one we accept on a drawing or publish here. Where a treatment has no governing standard, the parameters are agreed in writing per job.

Finishes, governing specification and added lead time
ItemGoverning specificationAdded lead timeApplies to
Bead blast
Media and pressure recorded per job+1 working daysAluminium, Titanium, Corrosion-resistant steel, Nickel alloy, Magnesium
Anodise Type II
MIL-A-8625 Type II, Class 1 & 2+3 working daysAluminium
Hard anodise Type III
MIL-A-8625 Type III+3 working daysAluminium
Chemical conversion
MIL-DTL-5541 Type I / II+3 working daysAluminium
Passivation
ASTM A967 / AMS 2700+2 working daysCorrosion-resistant steel
Titanium anodise
AMS-2488 Type 2+3 working daysTitanium
Electroless nickel
MIL-C-26074+4 working daysAluminium, Titanium, Corrosion-resistant steel, Nickel alloy, Magnesium
Vacuum bake-out
Profile agreed per programme+4 working daysAluminium, Titanium, Corrosion-resistant steel, Nickel alloy, Magnesium

Inspection

Inspection levels

Chosen per line on the RFQ. Where a vendor or an accredited lab took the measurement, our report says reviewed by or witnessed by, never inspected by.

Inspection levels and their effect on lead time
ItemAdded lead timeIncluded
Standard dimensional
No added timeOn every line
First Article (AS9102)
+1 working daysOn request
Full CMM report
+2 working daysOn request
CMM + NDT (DPI/UT)
+3 working daysOn request

Design guidance

Detailed guidance for this process is in preparation

The envelope, materials, finishes and inspection levels above are current. For design questions specific to your part, send the drawing and an engineer will review it with you.

Start

Send the drawing for surface treatment.

A costed, vendor-verified quote within 24 hours from Almost Aliens. DFM findings on every line before it goes anywhere.

Start an RFQ
  • ISO 9001in progress
  • AS9100D2027 roadmap
  • NDA before any vendor sees a filestandard practice

Tell us what you’re building

Have a requirement? Send it over.

Drawing, BOM, RFQ, sketch, photo or a written description. You do not need to know which category it falls into; identifying the right route is our job.

Where
Hyderabad, India
RFQ
Drawings and quantities ready? Use the line-item RFQ builder for a human-verified quote within 24 hours.
Supply
Manufacturer or test laboratory? Apply as a supplier.
What do you have so far? (optional, pick any)

Up to 20 files, 50 MB each: PDF, CAD (STEP, IGES, SolidWorks, Parasolid, DWG, DXF), images, spreadsheets, documents or a ZIP. Stored privately; only our team can open them.

Read by an engineer. Your company name never appears on anything a supplier sees. How files are handled.