Skip to content
LMOSTLINS

AA/CAP/001Capability

CNC machining

AA/CAP/001 · ENVELOPE 600 × 600 × 450 MM · ISO 2768-F · ISO 9001 IN PROGRESS · 24 H VERIFIED QUOTE

3-axis and 5-axis milling and CNC turning of brackets, fittings, housings and struts in aerospace alloys, executed through qualified manufacturing partners with first-article inspection and every finish tied to its specification.

Envelope and tolerances

What we commit to as standard

Beyond an envelope we route to manual review; we do not decline. Tolerance classes are per ISO 2768 unless a feature is called tighter on the drawing.

Standard envelope and baseline lead time by process
ItemStandard envelope (mm)Baseline lead time
CNC milling, 3-axis
Prototype quantity, before material and finish factors
800 × 500 × 40012 working days
CNC milling, 5-axis
Prototype quantity, before material and finish factors
600 × 600 × 45016 working days
CNC turning
Prototype quantity, before material and finish factors
400 × 300 × 30010 working days
Tolerance classes and feature limits
ItemValueGoverning standard / note
General tolerance
ISO 2768-mISO 2768-1 medium class; default when the drawing is silent
Fine tolerance
ISO 2768-fISO 2768-1 fine class; recommended for structural hardware
Precision features
±0.05 mmCalled per feature; verified on CMM
Precision features, hard alloys
±0.025 mmGrinding or hard-turning pass and CMM verification; a cost step, not a blocker
Minimum wall, committed
0.8 mmBelow this the line is held for review
Thin-wall review threshold
1.2 mmBetween the floor and this, a stress-relief step or accepted flatness deviation
Surface finish, as-machined
(125 Ra)Finer on request; see finishes

Materials

Alloys we source, by family

Certified stock with mill test certificates traced to heat and lot. The relative cycle-time factor drives our lead-time model; it is not a price factor.

Aluminium
ItemDensityCycle-time factorAnodising route
Aluminium 6061-T6
2.70 g/cm³×1.00MIL-A-8625
Aluminium 7075-T651
2.81 g/cm³×1.15MIL-A-8625
Aluminium 2024-T4
2.78 g/cm³×1.15MIL-A-8625
Titanium
ItemDensityCycle-time factorAnodising route
Titanium Gr5 (Ti-6Al-4V)
4.43 g/cm³×2.40AMS-2488
Corrosion-resistant steel
ItemDensityCycle-time factorAnodising route
Stainless 316L
8.00 g/cm³×1.80Not anodisable
Stainless 17-4 PH
7.80 g/cm³×2.00Not anodisable
Nickel alloy
ItemDensityCycle-time factorAnodising route
Inconel 718
8.19 g/cm³×3.00Not anodisable
Magnesium
ItemDensityCycle-time factorAnodising route
Magnesium AZ31B
1.77 g/cm³×0.90Not anodisable

Need an alloy not listed? Add it as a note on the RFQ line. It is routed for manual review with a sourcing check before we quote. We do not decline on the alloy alone.

Finishes

Every finish names its specification

A finish call-out without a specification is not one we accept on a drawing or publish here. Where a treatment has no governing standard, the parameters are agreed in writing per job.

Finishes, governing specification and added lead time
ItemGoverning specificationAdded lead timeApplies to
As-machined (125 Ra)
None (baseline, no treatment)No added timeAluminium, Titanium, Corrosion-resistant steel, Nickel alloy, Magnesium
Bead blast
Media and pressure recorded per job+1 working daysAluminium, Titanium, Corrosion-resistant steel, Nickel alloy, Magnesium
Anodise Type II
MIL-A-8625 Type II, Class 1 & 2+3 working daysAluminium
Hard anodise Type III
MIL-A-8625 Type III+3 working daysAluminium
Chemical conversion
MIL-DTL-5541 Type I / II+3 working daysAluminium
Passivation
ASTM A967 / AMS 2700+2 working daysCorrosion-resistant steel
Titanium anodise
AMS-2488 Type 2+3 working daysTitanium
Electroless nickel
MIL-C-26074+4 working daysAluminium, Titanium, Corrosion-resistant steel, Nickel alloy, Magnesium
Vacuum bake-out
Profile agreed per programme+4 working daysAluminium, Titanium, Corrosion-resistant steel, Nickel alloy, Magnesium

Inspection

Inspection levels

Chosen per line on the RFQ. Where a vendor or an accredited lab took the measurement, our report says reviewed by or witnessed by, never inspected by.

Inspection levels and their effect on lead time
ItemAdded lead timeIncluded
Standard dimensional
No added timeOn every line
First Article (AS9102)
+1 working daysOn request
Full CMM report
+2 working daysOn request
CMM + NDT (DPI/UT)
+3 working daysOn request

Machining is where most space and aerospace hardware starts: brackets, fittings, housings, struts and MGSE interfaces, in alloys that are unforgiving for a manufacturer without prior experience in them. We execute machined parts through partners qualified on those alloys, hold the drawing revision on their behalf, and inspect to the level the drawing calls. We state what will drive cost before you commit, not after.

What actually drives cost

Cycle time is rarely the driver on aerospace parts. These are:

  • Setups. Every re-fixturing is a datum transfer. A part with features on five faces is cheaper on a 5-axis machine in one setup than on a 3-axis machine in four, once quantity passes a handful.
  • Distortion after stress relief. Thin walls and long aspect ratios move when residual stress is released. Holding flatness on a long, thin bracket is a fixturing and sequencing problem, not a machining one, and it is priced as such.
  • Tolerance class on the wrong features. ±0.025 mm on a bearing seat is normal. ±0.025 mm on a clearance hole is a CMM record nobody needs.
  • Material. Titanium and nickel alloys run at a fraction of the feed of aluminium and eat tooling. The machinability factors in our lead-time model reflect that; a 7075 bracket and the same bracket in Inconel 718 are not the same job with a different price.
  • Finish sequence. Anodise, chem-film and passivation each add days and each has masking implications. Threads and datum faces are usually masked; say so on the drawing.

Design guidance

  • Keep walls at or above 1.2 mm where you can. Between 0.8 and 1.2 mm we will ask for a stress-relief step or an accepted flatness deviation. Below 0.8 mm the line is held for review.
  • Internal corner radii: specify the largest radius the design allows. A 1 mm internal radius on a deep pocket forces a small cutter and a long cycle; 3 mm rarely changes function.
  • Pocket depth to cutter diameter beyond about 4:1 invites chatter. Step the depth or open the pocket.
  • Put datums where the machinist can actually locate on them, and call them on the drawing. A machined datum face on a raw casting or a plate is worth more than any tolerance note.
  • Threads: call the class, the depth and whether an insert is fitted. State whether threads are masked during finishing.
  • Say which finish, to which specification, on which surfaces. "Anodise" without a type and class is not a finish call-out.

Where machining is the right answer, and where it is not

Machining wins on accuracy, on repeatability across a batch, and on the alloys that nothing else handles well: titanium, 17-4 PH and nickel alloys. It loses on deep internal channels, lattices and geometry that cannot be reached by a cutter; those are additive parts with machined interfaces. It also loses on large thin panels, which are sheet-metal parts. A drawing that asks for a machined-from-solid part where a formed and machined one would do is the most common cost error we see, and we will say so at DFM.

Questions

Frequently asked

Why is there no price on this page or in the RFQ builder?
We quote only against a written price from the manufacturing partner that will produce the part. That is a hard rule, and it is why our quote is a commitment rather than an estimate. The RFQ builder shows scope, lead time and manufacturability findings; a person costs it and you have a verified quote within 24 hours.
Which tolerance class should I call out?
ISO 2768-f as the general tolerance covers most structural hardware. Call ±0.05 mm or ±0.025 mm only on the features that need it (bearing seats, pilot diameters, mating datums) and expect those features to carry a CMM record. Calling a tight class on the whole drawing raises cost without raising function.
What does a HOLD finding on my line mean?
A person reviews the line before it is released to a vendor. It does not mean we decline the job. Typical causes are a wall below 0.8 mm, an envelope beyond the standard bed, or a finish that does not apply to the alloy. We come back with a route or an alternative.
Do you machine in-house?
No. We do not operate our own machining facility. We qualify the manufacturers, hold the drawing revision, run the inspection and own the documentation. Your PO is with us; every vendor PO behind it carries our job reference only, never your name.
What inspection comes with a machined part?
Standard dimensional inspection is included on every line. First Article to AS9102 is applied to every new part number or revision on request, and full CMM or CMM plus NDT where the drawing or the programme calls for it. Reports are attributed honestly, so where the vendor measured, ours says reviewed by.
Can you handle a part larger than the standard envelope?
Yes, on review. The envelopes on this page are what we commit to as standard. Larger beds exist in the qualified base; a larger part is routed for manual review rather than declined.

Start

Send the drawing for cnc machining.

A costed, vendor-verified quote within 24 hours from Almost Aliens. DFM findings on every line before it goes anywhere.

Start an RFQ
  • ISO 9001in progress
  • AS9100D2027 roadmap
  • NDA before any vendor sees a filestandard practice

Tell us what you’re building

Have a requirement? Send it over.

Drawing, BOM, RFQ, sketch, photo or a written description. You do not need to know which category it falls into; identifying the right route is our job.

Where
Hyderabad, India
RFQ
Drawings and quantities ready? Use the line-item RFQ builder for a human-verified quote within 24 hours.
Supply
Manufacturer or test laboratory? Apply as a supplier.
What do you have so far? (optional, pick any)

Up to 20 files, 50 MB each: PDF, CAD (STEP, IGES, SolidWorks, Parasolid, DWG, DXF), images, spreadsheets, documents or a ZIP. Stored privately; only our team can open them.

Read by an engineer. Your company name never appears on anything a supplier sees. How files are handled.