Skip to content
LMOSTLINS

AA/CAP/005Capability

Assembly and integration

AA/CAP/005 · ENVELOPE 2000 × 1200 × 1200 MM · ISO 2768-F · ISO 9001 IN PROGRESS · 24 H VERIFIED QUOTE

Kitting, mechanical assembly and serialised delivery of sub-assemblies, with inserts, fasteners and bonded joints installed to the drawing note, torque recorded per fastener, and one delivery challan per unit.

Envelope and tolerances

What we commit to as standard

Beyond an envelope we route to manual review; we do not decline. Tolerance classes are per ISO 2768 unless a feature is called tighter on the drawing.

Standard envelope and baseline lead time by process
ItemStandard envelope (mm)Baseline lead time
Assembly / integration
Prototype quantity, before material and finish factors
2000 × 1200 × 12008 working days
Tolerance classes and feature limits
ItemValueGoverning standard / note
General tolerance
ISO 2768-mISO 2768-1 medium class; default when the drawing is silent
Fine tolerance
ISO 2768-fISO 2768-1 fine class; recommended for structural hardware
Precision features
±0.05 mmCalled per feature; verified on CMM
Precision features, hard alloys
±0.025 mmGrinding or hard-turning pass and CMM verification; a cost step, not a blocker
Minimum wall, committed
0.8 mmBelow this the line is held for review
Thin-wall review threshold
1.2 mmBetween the floor and this, a stress-relief step or accepted flatness deviation
Surface finish, as-machined
(125 Ra)Finer on request; see finishes

Materials

Alloys we source, by family

Certified stock with mill test certificates traced to heat and lot. The relative cycle-time factor drives our lead-time model; it is not a price factor.

Aluminium
ItemDensityCycle-time factorAnodising route
Aluminium 6061-T6
2.70 g/cm³×1.00MIL-A-8625
Aluminium 7075-T651
2.81 g/cm³×1.15MIL-A-8625
Titanium
ItemDensityCycle-time factorAnodising route
Titanium Gr5 (Ti-6Al-4V)
4.43 g/cm³×2.40AMS-2488
Corrosion-resistant steel
ItemDensityCycle-time factorAnodising route
Stainless 316L
8.00 g/cm³×1.80Not anodisable
Stainless 17-4 PH
7.80 g/cm³×2.00Not anodisable

Need an alloy not listed? Add it as a note on the RFQ line. It is routed for manual review with a sourcing check before we quote. We do not decline on the alloy alone.

Inspection

Inspection levels

Chosen per line on the RFQ. Where a vendor or an accredited lab took the measurement, our report says reviewed by or witnessed by, never inspected by.

Inspection levels and their effect on lead time
ItemAdded lead timeIncluded
Standard dimensional
No added timeOn every line
First Article (AS9102)
+1 working daysOn request
Full CMM report
+2 working daysOn request
CMM + NDT (DPI/UT)
+3 working daysOn request

Design guidance

Detailed guidance for this process is in preparation

The envelope, materials, finishes and inspection levels above are current. For design questions specific to your part, send the drawing and an engineer will review it with you.

Start

Send the drawing for assembly and integration.

A costed, vendor-verified quote within 24 hours from Almost Aliens. DFM findings on every line before it goes anywhere.

Start an RFQ
  • ISO 9001in progress
  • AS9100D2027 roadmap
  • NDA before any vendor sees a filestandard practice

Tell us what you’re building

Have a requirement? Send it over.

Drawing, BOM, RFQ, sketch, photo or a written description. You do not need to know which category it falls into; identifying the right route is our job.

Where
Hyderabad, India
RFQ
Drawings and quantities ready? Use the line-item RFQ builder for a human-verified quote within 24 hours.
Supply
Manufacturer or test laboratory? Apply as a supplier.
What do you have so far? (optional, pick any)

Up to 20 files, 50 MB each: PDF, CAD (STEP, IGES, SolidWorks, Parasolid, DWG, DXF), images, spreadsheets, documents or a ZIP. Stored privately; only our team can open them.

Read by an engineer. Your company name never appears on anything a supplier sees. How files are handled.