AA/CAP/005Capability
Assembly and integration
AA/CAP/005 · ENVELOPE 2000 × 1200 × 1200 MM · ISO 2768-F · ISO 9001 IN PROGRESS · 24 H VERIFIED QUOTE
Kitting, mechanical assembly and serialised delivery of sub-assemblies, with inserts, fasteners and bonded joints installed to the drawing note, torque recorded per fastener, and one delivery challan per unit.
Envelope and tolerances
What we commit to as standard
Beyond an envelope we route to manual review; we do not decline. Tolerance classes are per ISO 2768 unless a feature is called tighter on the drawing.
| Item | Standard envelope (mm) | Baseline lead time |
|---|---|---|
Assembly / integration Prototype quantity, before material and finish factors | 2000 × 1200 × 1200 | 8 working days |
| Item | Value | Governing standard / note |
|---|---|---|
General tolerance | ISO 2768-m | ISO 2768-1 medium class; default when the drawing is silent |
Fine tolerance | ISO 2768-f | ISO 2768-1 fine class; recommended for structural hardware |
Precision features | ±0.05 mm | Called per feature; verified on CMM |
Precision features, hard alloys | ±0.025 mm | Grinding or hard-turning pass and CMM verification; a cost step, not a blocker |
Minimum wall, committed | 0.8 mm | Below this the line is held for review |
Thin-wall review threshold | 1.2 mm | Between the floor and this, a stress-relief step or accepted flatness deviation |
Surface finish, as-machined | (125 Ra) | Finer on request; see finishes |
Materials
Alloys we source, by family
Certified stock with mill test certificates traced to heat and lot. The relative cycle-time factor drives our lead-time model; it is not a price factor.
| Item | Density | Cycle-time factor | Anodising route |
|---|---|---|---|
Aluminium 6061-T6 | 2.70 g/cm³ | ×1.00 | MIL-A-8625 |
Aluminium 7075-T651 | 2.81 g/cm³ | ×1.15 | MIL-A-8625 |
| Item | Density | Cycle-time factor | Anodising route |
|---|---|---|---|
Titanium Gr5 (Ti-6Al-4V) | 4.43 g/cm³ | ×2.40 | AMS-2488 |
| Item | Density | Cycle-time factor | Anodising route |
|---|---|---|---|
Stainless 316L | 8.00 g/cm³ | ×1.80 | Not anodisable |
Stainless 17-4 PH | 7.80 g/cm³ | ×2.00 | Not anodisable |
Need an alloy not listed? Add it as a note on the RFQ line. It is routed for manual review with a sourcing check before we quote. We do not decline on the alloy alone.
Inspection
Inspection levels
Chosen per line on the RFQ. Where a vendor or an accredited lab took the measurement, our report says reviewed by or witnessed by, never inspected by.
| Item | Added lead time | Included |
|---|---|---|
Standard dimensional | No added time | On every line |
First Article (AS9102) | +1 working days | On request |
Full CMM report | +2 working days | On request |
CMM + NDT (DPI/UT) | +3 working days | On request |
Design guidance
Detailed guidance for this process is in preparation
The envelope, materials, finishes and inspection levels above are current. For design questions specific to your part, send the drawing and an engineer will review it with you.
Start
Send the drawing for assembly and integration.
A costed, vendor-verified quote within 24 hours from Almost Aliens. DFM findings on every line before it goes anywhere.
- ISO 9001in progress
- AS9100D2027 roadmap
- NDA before any vendor sees a filestandard practice