Skip to content
LMOSTLINS

Industries

Who we execute for

Five sectors, one procurement problem each. Every alloy, finish and inspection level below is read from the same domain file the RFQ builder runs on; the finish specifications are the ones we hold vendors to.

Satellites and space

Small teams, many part numbers, few of each, and a launch date that does not move. The failure is rarely one bad part; it is fourteen part numbers across six vendors arriving out of step.

Typical hardware

  • Bus structural brackets and fittings
  • Shear and closeout panels
  • Harness brackets and standoffs
  • MGSE: handling frames, lift fixtures, transport containers
  • Thermal strap interfaces and radiator mounts

Processes

What to watch in this sector

Vacuum compatibility. A finish that is fine on the ground can outgas in orbit; bake-out profiles and finish specs are agreed per programme, and a chem-film call-out without a type and class is sent back before it is quoted.

Alloys typically sourced
ItemFamilyDensity
Aluminium 7075-T651
Aluminium2.81 g/cm³
Aluminium 6061-T6
Aluminium2.70 g/cm³
Titanium Gr5 (Ti-6Al-4V)
Titanium4.43 g/cm³
Inconel 718
Nickel alloy8.19 g/cm³
Magnesium AZ31B
Magnesium1.77 g/cm³
Finishes and their governing specification
ItemGoverning specificationAdded lead time
Chemical conversion
MIL-DTL-5541 Type I / II+3 d
Anodise Type II
MIL-A-8625 Type II, Class 1 & 2+3 d
Hard anodise Type III
MIL-A-8625 Type III+3 d
Titanium anodise
AMS-2488 Type 2+3 d
Vacuum bake-out
Profile agreed per programme+4 d
Inspection levels usually called
ItemAdded lead time
First Article (AS9102)
+1 d
Full CMM report
+2 d
Documents that travel with the parts
  • First Article Inspection (AS9102)AA/FAI/2026-27/0100
  • CMM reportAA/CMM/2026-27/0101
  • Material test certificateAA/MTC/2026-27/0102
  • Certificate of conformanceAA/COC/2026-27/0103
  • Delivery challanAA/DC/2026-27/0104

Reference format shown with an example sequence. Numbers are assigned from the database when a document issues.

Across every sector

What goes wrong, and what we do about it

These are the failures we have seen on real programmes. Each has a mechanism behind it, not a promise.

01A vendor cuts the superseded revision.
Revision is pinned on the vendor RFQ and PO; the old drawing is withdrawn from the vendor's access when a new one issues.
02A finish is called out without a specification.
The line is held at DFM until the type, class and specification are on the drawing. A finish without a spec is not quoted.
03A thin-walled part distorts after stress relief.
Walls below 1.2 mm raise a CHECK, below 0.8 mm a HOLD, before anything is released. Fixturing and sequencing are agreed, not discovered.
04A schedule slip is discovered at delivery.
Milestones are tracked per vendor PO with stage photos. A slip is told to you the day we know it.
05The client's identity reaches a vendor.
Vendor-facing documents carry our job reference only. This is a default on the record, not a step someone remembers.
06A third-party certificate is re-typed onto a supplier letterhead.
Never. NABL and TÜV certificates travel as issued, with the lab's name and ULR number. Our report says reviewed by or witnessed by.

Start

Send the drawing set. We take it from there.

A costed, vendor-verified quote within 24 hours, then one accountable owner through to inspection and delivery.

Start an RFQ
  • ISO 9001in progress
  • AS9100D2027 roadmap
  • NDA before any vendor sees a filestandard practice

Tell us what you’re building

Have a requirement? Send it over.

Drawing, BOM, RFQ, sketch, photo or a written description. You do not need to know which category it falls into; identifying the right route is our job.

Where
Hyderabad, India
RFQ
Drawings and quantities ready? Use the line-item RFQ builder for a human-verified quote within 24 hours.
Supply
Manufacturer or test laboratory? Apply as a supplier.
What do you have so far? (optional, pick any)

Up to 20 files, 50 MB each: PDF, CAD (STEP, IGES, SolidWorks, Parasolid, DWG, DXF), images, spreadsheets, documents or a ZIP. Stored privately; only our team can open them.

Read by an engineer. Your company name never appears on anything a supplier sees. How files are handled.