Quality in execution is a set of mechanisms, not a wall of badges: the certification position said plainly, a document set with locked numbering, honest attribution on every report, a qualification process vendors actually go through, and a confidentiality rule that lives in the data model.

Certification position

Exactly where we stand

ISO 9001IN PROGRESS
Being implemented; not yet certified. We will not describe it as held until the certificate is issued.
AS9100DROADMAP
Planned. Not claimed, not implied, not on a badge.
NDA before any vendor sees a fileIN USE TODAY
Applied on live jobs now. Ask for a sample report on your first enquiry.

This is the whole list. If a certification is not here, we do not hold it. Third-party certificates from accredited labs (NABL, TÜV) are supplied as issued, carrying the lab's own name and ULR number; we never re-brand or re-type them.

Document set

What arrives with the parts

Six document types, each numbered on the locked scheme and each attributed to whoever actually took the measurement. Hover a card to see what is inside.

  • AA/FAI/2026-27/0100FAI

    First Article Inspection

    AS9102 forms 1–3 on the first part of every new part number or revision.

    • Form 1 part accountability
    • Form 2 materials and processes
    • Form 3 characteristic accountability
    • Ballooned drawing

    Measured by vendor or lab · Reviewed by Almost Aliens

  • AA/CMM/2026-27/0107CMM

    CMM report

    Full dimensional report against the ballooned drawing where the inspection level calls for it.

    • Per-characteristic nominal, actual, deviation
    • Programme and probe record
    • Machine calibration reference

    Measured by vendor CMM · Witnessed or reviewed by Almost Aliens

  • AA/MTC/2026-27/0114MTC

    Material test certificate

    Mill certificate for the stock the part was cut from, traced to heat and lot.

    • Chemical composition
    • Mechanical properties
    • Heat and lot number

    Issued by the mill · Unaltered, on the mill's own paper

  • AA/NDT/2026-27/0121NDT

    NDT report

    Dye penetrant or ultrasonic inspection where the drawing or the weld class requires it.

    • Method and acceptance standard
    • Technician certification level
    • Indications and disposition

    Issued by the NABL-accredited lab with its ULR · Never re-branded

  • AA/COC/2026-27/0128COC

    Certificate of conformance

    Our statement that the delivered items conform to the order, the drawing revision and the specifications called.

    • Order and line references
    • Drawing revision
    • Finish specifications applied

    Issued by Almost Aliens

  • AA/DC/2026-27/0135DC

    Delivery challan

    One per delivery, closing the loop from PO line to received quantity.

    • Line, serial and quantity
    • Package and handling notes
    • Document set enclosed

    Issued by Almost Aliens

Numbering

Locked reference formats

Sequences come from the database, never from a form or a spreadsheet. A reference in one of these formats means the document exists in our system with that number.

Document reference formats with example sequences
ItemFormatExample
Client quotation
Assigned when the quote issues, not when an enquiry is received
AA/QTN/YYYY-YY/NNNAA/QTN/2026-27/047
Vendor purchase order
Carries our job reference; the client is structurally absent
AA-PO-FYFY-NNNAA-PO-2627-212
First Article Inspection
AA/FAI/FY/NNNNAA/FAI/2026-27/0118
CMM report
AA/CMM/FY/NNNNAA/CMM/2026-27/0119
Material test certificate (as filed)
Our filing reference; the mill certificate itself is unaltered
AA/MTC/FY/NNNNAA/MTC/2026-27/0120
NDT report (as filed)
Our filing reference; the lab report carries its own ULR
AA/NDT/FY/NNNNAA/NDT/2026-27/0121
Certificate of conformance
AA/COC/FY/NNNNAA/COC/2026-27/0122
Delivery challan
AA/DC/FY/NNNNAA/DC/2026-27/0123

Inspection levels

Chosen per line, priced per line, reported per line

Inspection levels
ItemAdded lead timeIncluded
Standard dimensional
No added timeEvery line
First Article (AS9102)
+1 working daysOn request
Full CMM report
+2 working daysOn request
CMM + NDT (DPI/UT)
+3 working daysOn request
Tolerance classes and limits we commit to
ItemValue
ISO 2768-m (general)
ISO 2768-1
ISO 2768-f (fine)
ISO 2768-1
±0.05 mm
Per feature, CMM verified
±0.025 mm
Per feature, CMM verified
Minimum wall, committed
0.8 mm
Thin-wall review threshold
1.2 mm

Attribution

Reviewed by. Witnessed by. Never inspected by.

We do not operate our own machining facility. When a vendor or an accredited lab takes the measurement, our report says so, and says what we did: reviewed the record against the drawing, or stood at the machine and witnessed it. A report that claims otherwise is a report you cannot rely on in a failure investigation, and we would rather you could.

MEASURED BY
The vendor's inspector or the accredited lab. Named on the report.
WITNESSED BY
An Almost Aliens engineer present at the measurement. Used on first articles and critical features.
REVIEWED BY
An Almost Aliens engineer who checked the record against the drawing revision and the specification. Used on every report.

Vendor qualification

How a manufacturer becomes a qualified vendor

Qualification is physical and specific: a manufacturer is qualified for defined job classes (process, material, tolerance class and inspection level), not for everything. RFQs only go to vendors qualified for that class.

  1. 01

    Application and documents

    Ten minutes online. We ask for the registrations that make you a vendor we can pay and the certificates you already hold. No bank details are requested on a web form.

  2. 02

    Capability review

    A conversation with an engineer about what you actually cut, in which alloys, to which tolerance class, with what inspection equipment.

  3. 03

    Test part or witnessed job

    Qualification is physical, not paperwork. Either a test part to a drawing we supply, or a witnessed first job at low quantity.

  4. 04

    Qualified for job classes

    You are qualified for specific classes, not for everything. Certified vendors unlock more classes; nobody is asked to quote work they have not been qualified for.

  5. 05

    Performance on record

    On-time delivery and first-article pass rate are tracked per PO. Good performance widens the classes you are asked to quote; a miss is discussed, not hidden.

A manufacturer or treatment house? Read the vendor page and apply.

Confidentiality

Your identity is absent from vendor documents by default

Files encrypted at rest

CAD and drawings are stored encrypted. Every download is logged against a named individual.

NDA before release

No vendor downloads a drawing without an NDA on file. Qualification includes it.

Job reference only

Vendor RFQs and POs carry an internal job reference. The client-hidden flag is a default on the record, not a step someone remembers.

Revision pinned

The drawing revision is stated on every vendor document and the superseded revision is withdrawn.

The full file-handling mechanism is described on the security page, linked from every upload point on this site.

  • ISO 9001in progress
  • AS9100D2027 roadmap
  • NDA before any vendor sees a filestandard practice
Start an RFQ

Tell us what you’re building

Have a requirement? Send it over.

Drawing, BOM, RFQ, sketch, photo or a written description. You do not need to know which category it falls into; identifying the right route is our job.

Where
Hyderabad, India
RFQ
Drawings and quantities ready? Use the line-item RFQ builder for a human-verified quote within 24 hours.
Supply
Manufacturer or test laboratory? Apply as a supplier.
What do you have so far? (optional, pick any)

Up to 20 files, 50 MB each: PDF, CAD (STEP, IGES, SolidWorks, Parasolid, DWG, DXF), images, spreadsheets, documents or a ZIP. Stored privately; only our team can open them.

Read by an engineer. Your company name never appears on anything a supplier sees. How files are handled.